dRay Tech’s construction management team is degreed in building construction and experienced in completing high-tech facilities and complex equipment installation.
Mission critical facilities have been the company’s and principals' sole focus for over three decades. There is no substitute for the breadth of experience that dRay Tech offers for end-to-end management throughout the construction process. The seamless oversight of every detail, from design drawings to subcontractor selection and equipment procurement/installation, delivers a sustainable facility in the shortest timeframe possible within budget.
As data center managers face IT space challenges and fast rising energy costs, the data center experts at dRay Tech offer comprehensive solutions to mission critical facility challenges.
Site Upgrades
Sometimes there is additional “life” in an existing facility with upgrades that can maximize space, lower energy costs and add monitoring equipment to improve efficiency analysis.
New Building
The exponential growth of data transmission and archiving has reached capacity at over 44% of AFCOM member data centers.* The need for new data center space is now a major factor in strategic planning in the next decade. The EPA estimates that data center energy requirements are doubling again between 2006 and 2011. To manage costs and improve efficiency of cooling and power conversion systems, new efficiency standards will suggest ways to lower power consumption yet provide 24/7 redundancy.
dRay Tech provides the professional team that is knowledgeable in all areas of new building design and LEED engineering for the new Green building requirements.
*2008 update to Building the Business Case for Data Center Efficiency by Matt Stansberry.